Experience and Knowledge
L.J. Keefe Company offers a comprehensive range of specialized services
tailored to meet the demands of tunnel construction and engineering
projects. Our seasoned professionals are equipped with knowledge,
experience, and cutting-edge technology to ensure successful execution of
tunneling endeavors.

Description
The steel casing pipe is machine bored (augured) and jacked-in-place simultaneously, so that there is no ‘open excavation’ in front of the casing. The soils are transported back to the work shaft by auger conveyance within the casing.
A cutting head suitable for the ground condition is attached to the lead auger. The cutting head is positioned immediately outside the casing in stable soils, permitting wing cutters to mine the face of the excavation heading one inch (1”) larger than the casing, thereby reducing the friction on the outside wall of the casing. In the event that unstable soils are encountered, the cutting head is retracted inside the casing. The cutting head, with full-size augers behind it, prevents loose soils from surcharging into the casing.
Grade of the steel casing is continuously monitored by water level and adjusted through the use of a steering head connected to the lead piece of casing. Line is checked at regular intervals by conventional surveying instruments, and manual adjustments can be made as necessary.


Application
Auger boring is a common, two-pass method for installing steel casing as a liner to accommodate a new underground utility (carrier) pipe. The casing diameter can be sized to accommodate any type of service pipe specified by the project's requirements.
Soils
Standard dirt cutterheads are used for boring through clay and sand soils. The cutterheads can also be equipped with carbide tipped ‘bullet’ teeth for boring through full-face, soft rock and shale.
Casing/Pipe Material
Steel Casing
Diameter from 12” O.D. to 84” O.D.
Limited to installing smooth-wall steel pipe due to the size.
Drive Lengths
Ranging from 25 LF up to 600 LF.
Description
The steel casing pipe is machine bored (augured) and jacked-in-place simultaneously, so that there is no ‘open excavation’ in front of the casing. The soils are transported back to the work shaft by auger conveyance within the casing.
A cutting head suitable for the ground condition is attached to the lead auger. The cutting head is positioned immediately outside the casing in stable soils, permitting wing cutters to mine the face of the excavation heading one inch (1”) larger than the casing, thereby reducing the friction on the outside wall of the casing. In the event that unstable soils are encountered, the cutting head is retracted inside the casing. The cutting head, with full-size augers behind it, prevents loose soils from surcharging into the casing.
Grade of the steel casing is continuously monitored by water level and adjusted through the use of a steering head connected to the lead piece of casing. Line is checked at regular intervals by conventional surveying instruments, and manual adjustments can be made as necessary.

Application
Auger boring is a common, two-pass method for installing steel casing as a liner to accommodate a new underground utility (carrier) pipe. The casing diameter can be sized to accommodate any type of service pipe specified by the project's requirements.
Casing/Pipe Material
Steel Casing
Diameter from 12” O.D. to 84” O.D.
Limited to installing smooth-wall steel pipe due to the size.
Drive Lengths
Ranging from 25 LF up to 600 LF.
Soils
Standard dirt cutterheads are used for boring through clay and sand soils. The cutterheads can also be equipped with carbide tipped ‘bullet’ teeth for boring through full-face, soft rock and shale.
Here at L.J. Keefe Co. our industry partners are of high importance.
If you are interested in working with us, please reach out.
Contact us today.
CONTACT US

847.577.7715


L.J. KEEFE CO. All Rights Reserved.

Corporate Office
704 W. Central Road
Mount Prospect, IL 60056